Borosil Renewables., Bharuch
Year: 2022-2023
550 TPD Solar Glass Furnace Construction
The design of the Furnace was orchestrated by TECO Glass - USA. It's a Cross-Fired Furnace & our comprehensive scope encompassed of Refractory Installations, Structural Steel, Combustion Systems, Air Cooling Ductings, Merkel Wall, Chimney Refractory Lining, PEB's. Furthermore, our expertise extended to the meticulous Fabrication & Assembly of Throat Coolers and Water Jackets, etc.
SOTUVER GLASS, Tunisia Year- 2022 300 TPD Container Glass Project
The Furnace designed by BDF Industries, Italy. It is End-Fired Furnace & comprehensive scope encompassed of entire Furnace Installations in a stipulated time period.
BOROSIL LIMITED, Jaipur
Year: 2022
42 TPD Opal Glass Project
The Furnace was designed by JSJ-HORN Germany. The Furnace construction was carried out in a stipulated time period, the work comprised of Steel & Refractory works, Air Cooling Ducting & Hanging Crown Casting, etc.
BOROSIL LIMITED, Jaipur
Year - 2022
42 TPD Opal Glass Cold Repair Work
The Furnace was designed by JSJ HORN, Germany. The work consists of Refractory Dismantling & New Refractory Installations with steel and other associated works i.e., Air Cooling Ducting etc. The work carried out successfully in advance of scheduled Time period.
BOROSIL LIMITED, Jaipur
Year - 2023
Borosilicate Glass Furnace Project
The Furnace was designed by JSJ HORN, Germany. The work scope included Steel Structural, F/H Casings & Refractory Installations work, along with other associated works i.e., Air Cooling Ducting, Hanging Crown Casting, etc.
PGP GLASS PVT. LTD., Jambusar
Year - 2022
160 TPD - Furnace Cold Repair Work
PGP Glass, formerly Piramal Glass Ltd., near Vadodara. The entire work was carried out successfully in a stipulated time period.
The work comprehensive scope encompassed of Refractory dismantling & new Refractory Installations along with Steel works, Air Cooling etc.
PGP GLASS PVT. LTD., Kosamba
Year - 2023
95 TPD - Furnace Cold Repair Work
The Cold Repair of 95 TPD End-fired cosmetic furnace carried out successfully with work scopes comprising of Refractory Dismantling & New Installations along with steel works, Air Cooling Duct, Manual Dampers etc.
PGP GLASS PVT LTD, Jambusar
Year - 2021
250 TPD Furnace Chimney Lining Work
The Refractory Lining in a 80-meter-tall metal chimney was facilitated through a winch-trolley mechanism. The comprehensive project was successfully completed with entire safety and in stipulated time frame.
PGP GLASS PVT LTD, Jambusar
160 TPD Throat Patching Work - Jan' 2021
265 TPD Furnace Noozle Alignment - Dec' 2022
J20 F/H Re-lining Work - June 2022
265 TPD Furnace Noozle Alignment - Dec' 2022
J20 F/H Re-lining Work - June 2022
PGP GLASS PVT LTD, Kosamba
45 TPD Furnace Overcoating work - Jan' 2022
55 TPD Furnace Overcoating work - Aug' 2021
95 TPD Furnace Overcoating work - Aug' 2022
95 TPD Furnace -S3 F/H Relining work - Aug'2022
40 TPD Furnace Overcoating work - April' 2023
55 TPD Furnace Overcoating work - May 2023
60 TPD Furnace Overcoating work - July' 2023
55 TPD Furnace Overcoating work - Aug' 2021
95 TPD Furnace Overcoating work - Aug' 2022
95 TPD Furnace -S3 F/H Relining work - Aug'2022
40 TPD Furnace Overcoating work - April' 2023
55 TPD Furnace Overcoating work - May 2023
60 TPD Furnace Overcoating work - July' 2023
OWENS CORNING (I) PVT LTD, Taloja
Melter Bottom Plate Drilling Work - Aug'2022
L5-02 Furnace Stack Hot Repair Work - Mar'2021
L5-01 Furnace Partial F/H Demolitio - Aug'2023
L5-02 Furnace Stack Hot Repair Work - Mar'2021
L5-01 Furnace Partial F/H Demolitio - Aug'2023
CANPACK INDIA PVT. LTD.,
Aurangabad
Port Gallery Overcoating Work - Mar'2021
Skew Cooling Work - Mar'2022
Doghouse Overcoating IF#1 & IF#2 - Dec'2022
Skew Cooling Work - Mar'2022
Doghouse Overcoating IF#1 & IF#2 - Dec'2022
SAINT GOBAIN INDIA PVT LTD., Jhagadia
Regenerator Penetration Wall Repair Work in Hot Condition. - Dec'2021
AFICO,
KSA
Stack Chromic Oxide Refractory Replacement Hot work - Jan'2022